8 permit(s) changed to inactive: ASTORIA REGIONAL AIRPORT/Astoria Regional Airport – Runway 13-31 Rehabilitation (Stormwater; NPDES construction more than 1 acre disturbed ground) BEAVERTON SCHOOL…
permits added & deleted
Posted in Uncategorized
Posted in Uncategorized
8 permit(s) changed to inactive: ASTORIA REGIONAL AIRPORT/Astoria Regional Airport – Runway 13-31 Rehabilitation (Stormwater; NPDES construction more than 1 acre disturbed ground) BEAVERTON SCHOOL…
Posted in Uncategorized
2 permit(s) changed to inactive: DAIMLER TRUCKS NORTH AMERICA LLC/DIAMLER HIGH DESERT PROVING GROUNDS (Stormwater; NPDES construction more than 1 acre disturbed ground) DG-CHILOQUIN, OR-1-UT,…
Posted in Uncategorized
2 permit(s) changed to inactive: TRAN CO./EAGLES VIEW PHASE 6 (2016) (Stormwater; NPDES construction more than 1 acre disturbed ground) HERITAGE POINT PROPERTIES, LLC/HIGH RIDGE…
Posted in Uncategorized
1 new permit(s) added: Beaver Ventures, LLC/Hillsboro DFT OR1 Data Center (Stormwater; NPDES construction more than 1 acre disturbed ground, issued by agent)
Posted in Uncategorized
2 new permit(s) added: City of Eagle Point, Public Works Department/Linn Road – OR 62 To Buchanan Street Imrpovements (Stormwater; NPDES construction more than 1…
Posted in Uncategorized
1 new permit(s) added: Humbert Asphalt, Inc./Highland Avenue Bicycle/Pedestrian Path (Stormwater; NPDES construction more than 1 acre disturbed ground)
Posted in Uncategorized
1 new permit(s) added: Icon Construction & Development, LLC/Redwood Landing (Stormwater; NPDES construction more than 1 acre disturbed ground)
Posted in Uncategorized
1 permit(s) changed to inactive: KENDALL FORD, INC/KENDALL FORD, INC (Industrial Wastewater; NPDES wash water)
Posted in Uncategorized
2 new permit(s) added: Polygon WLH, LLC by William Lyon Homes, Inc./South River Terrace (Stormwater; NPDES construction more than 1 acre disturbed ground, issued by…
Posted in Uncategorized
1 new permit(s) added: Trojan Storage of Portland, LLC/Trojan Storage of Portland (Stormwater; NPDES construction more than 1 acre disturbed ground)