2 new permit(s) added:
Smart & Final/Cash & Carry #503 (Stormwater; NPDES construction more than 1 acre disturbed ground)
Sunrise Water Authority/Stockpiling Area for SWA Reservoir No. 11 (Stormwater; NPDES construction more than 1 acre disturbed ground)
permits added & deleted
Posted in Uncategorized